{"id":11559,"date":"2026-08-13T16:24:00","date_gmt":"2026-08-13T16:24:00","guid":{"rendered":"https:\/\/mbmlog.com\/?p=11559"},"modified":"2026-08-13T16:24:00","modified_gmt":"2026-08-13T16:24:00","slug":"how-ship-electric-forklifts-china-via-sea-freight","status":"publish","type":"post","link":"https:\/\/mbmlog.com\/it\/how-ship-electric-forklifts-china-via-sea-freight\/","title":{"rendered":"How to Ship Electric Forklifts from China via Sea Freight?"},"content":{"rendered":"<style>article img, .entry-content img, .post-content img, .wp-block-image img, figure img, p img {max-width:100% !important; height:auto !important;}figure { max-width:100%; }img.top-image-square {width:280px !important; height:280px !important; object-fit:cover !important;border-radius:12px; box-shadow:0 2px 12px rgba(0,0,0,0.10);}@media (max-width:600px) {img.top-image-square { width:100% !important; height:auto !important; max-height:300px; }p:has(> img.top-image-square) { float:none !important; margin:0 auto 15px auto !important; text-align:center; }}.claim { background-color:#fff4f4; border-left:4px solid #e63946; border-radius:10px; padding:20px 24px; margin:24px 0; font-family:system-ui,sans-serif; line-height:1.6; position:relative; box-shadow:0 2px 6px rgba(0,0,0,0.03); }.claim-true { background-color:#eafaf0; border-left-color:#2ecc71; }.claim-icon { display:inline-block; font-size:18px; color:#e63946; margin-right:10px; vertical-align:middle; }.claim-true .claim-icon { color:#2ecc71; }.claim-title { display:flex; align-items:center; font-weight:600; font-size:16px; color:#222; }.claim-label { margin-left:auto; font-size:12px; background-color:#e63946; color:#fff; padding:3px 10px; border-radius:12px; font-weight:bold; }.claim-true .claim-label { background-color:#2ecc71; }.claim-explanation { margin-top:8px; color:#555; font-size:15px; }.claim-pair { margin:32px 0; }<\/style>\n<p style=\"float: right; margin-left: 15px; margin-bottom: 15px;\">\n  <img decoding=\"async\" style=\"max-width:100%;\" src=\"https:\/\/mbmlog.com\/wp-content\/uploads\/2026\/08\/v2-article-1786504919147-1.jpg\" alt=\"Guide to shipping electric forklifts from China via sea freight (ID#1)\" class=\"top-image-square\">\n<\/p>\n<p>Shipping electric forklifts from China via sea freight looks simple until the lithium battery enters the picture. At our Zhengzhou logistics office, we see carriers reject bookings weekly over missing battery paperwork.<\/p>\n<p><strong>To ship electric forklifts from China via sea freight, book FCL container space with a carrier that accepts Class 9 dangerous goods, prepare UN38.3, MSDS, and a Dangerous Goods Declaration, secure the forklift inside a 20ft or 40HQ container, and clear customs under HS Code 8427.10.<\/strong><\/p>\n<p>That is the short answer. The details decide whether your forklift arrives on schedule or sits at a Chinese port waiting for rebooking. Let me walk you through each step.<\/p>\n<h2>What documents do I need to ship an electric forklift from China by sea?<\/h2>\n<p>Last quarter, our team held a container at Qingdao for nine days because a factory sent us a UN38.3 report issued for a different battery model. Paperwork is where most shipments fail.<\/p>\n<p><strong>You need a commercial invoice, packing list, Bill of Lading, Certificate of Origin, export customs declaration, plus three battery documents: a UN38.3 test report, a Material Safety Data Sheet (MSDS), and a signed Dangerous Goods Declaration prepared by a qualified DG specialist.<\/strong><\/p>\n<p><img decoding=\"async\" style=\"max-width:100%; height:auto;\" src=\"https:\/\/mbmlog.com\/wp-content\/uploads\/2026\/08\/v2-article-1786504923820-2.jpg\" alt=\"Required documents for shipping electric forklifts by sea including battery paperwork (ID#2)\" title=\"Shipping Documentation Requirements\"><\/p>\n<p>The document set splits into two groups: standard export paperwork and battery compliance paperwork. Most importers already know the first group. The second group is what makes an electric forklift different from a diesel unit.<\/p>\n<h3>Standard export documents<\/h3>\n<table>\n<thead>\n<tr>\n<th>Document<\/th>\n<th>Purpose<\/th>\n<th>Common Error<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Commercial invoice<\/td>\n<td>Declares value and HS Code 842710<\/td>\n<td>Value mismatch with payment records<\/td>\n<\/tr>\n<tr>\n<td>Packing list<\/td>\n<td>Lists dimensions, weight, quantity<\/td>\n<td>Weight differs from actual cargo<\/td>\n<\/tr>\n<tr>\n<td>Bill of Lading<\/td>\n<td>Contract of carriage and title<\/td>\n<td>Consignee name spelled wrong<\/td>\n<\/tr>\n<tr>\n<td>Certificate of Origin<\/td>\n<td>Supports duty treatment at destination<\/td>\n<td>Not requested before departure<\/td>\n<\/tr>\n<tr>\n<td>Export customs declaration<\/td>\n<td>Required for China customs filing<\/td>\n<td>Specs conflict with invoice<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Battery compliance documents<\/h3>\n<p>Lithium battery packs on electric forklifts are classified as Class 9 hazardous goods under the <a href=\"https:\/\/www.imo.org\/en\/OurWork\/Safety\/Pages\/DangerousGoods-default.aspx\" target=\"_blank\" rel=\"noopener noreferrer\">IMDG Code regulations<\/a> <sup id=\"ref-1\"><a href=\"#footnote-1\" class=\"footnote-ref\">1<\/a><\/sup>, typically under UN3480 or UN3481. That classification triggers three mandatory documents. First, the <a href=\"https:\/\/mbmlog.com\/?p=11547\">UN38.3 test report<\/a> proves the battery passed transport safety testing. Here is a critical point we stress with every client: the UN38.3 report must come from the battery manufacturer, not the forklift assembler. Many forklift factories buy battery packs from third parties and cannot legally issue this report themselves. Second, the <a href=\"https:\/\/www.osha.gov\/hazcom\" target=\"_blank\" rel=\"noopener noreferrer\">Material Safety Data Sheet<\/a> <sup id=\"ref-2\"><a href=\"#footnote-2\" class=\"footnote-ref\">2<\/a><\/sup> describes the battery chemistry and emergency handling. Third, the Dangerous Goods Declaration must be signed by a <a href=\"https:\/\/mbmlog.com\/?p=11541\">certified DG specialist<\/a> before the carrier will load your container.<\/p>\n<p>For destination compliance, US-bound forklifts often need UL-certified chargers and EPA considerations, while EU-bound units need CE marking. Importers shipping to Europe should also start collecting Battery Passport data, including carbon footprint and recycled content, to comply with EU Regulation 2023\/1542. We check charger voltage against the destination country before booking, because a mismatched charger creates problems no shipping document can fix.<\/p>\n<div class=\"claim-pair\">\n<div class=\"claim claim-true\">\n<div class=\"claim-title\"><span class=\"claim-icon\">\u2714<\/span> The UN38.3 test report must be issued by the battery manufacturer, not the forklift assembler <span class=\"claim-label\">True<\/span><\/div>\n<div class=\"claim-explanation\">Most forklift factories source battery packs from separate battery makers, and only the entity that manufactured and tested the cells can provide a valid UN38.3 report accepted by carriers.<\/div>\n<\/div>\n<div class=\"claim claim-false\">\n<div class=\"claim-title\"><span class=\"claim-icon\">\u2718<\/span> A standard machinery invoice and packing list are enough to ship an electric forklift by sea <span class=\"claim-label\">False<\/span><\/div>\n<div class=\"claim-explanation\">The lithium battery classifies the shipment as Class 9 dangerous goods, so carriers will refuse the booking without a UN38.3 report, MSDS, and a signed Dangerous Goods Declaration.<\/div>\n<\/div>\n<\/div>\n<h2>How much does it cost to ship an electric forklift from China via sea freight?<\/h2>\n<p>One trade-off we weigh with every quote is base ocean rate versus total landed cost. A cheap rate that excludes DG surcharges and destination charges is not a cheap rate \u2014 it is an incomplete one.<\/p>\n<p><strong>Ocean freight for a 40HQ container carrying electric forklifts typically runs $1,500\u2013$4,000 depending on route and service level. Add DG surcharges, inland trucking, container loading, customs clearance, and destination charges, so budget the full landed cost rather than the base ocean rate alone.<\/strong><\/p>\n<p><img decoding=\"async\" style=\"max-width:100%; height:auto;\" src=\"https:\/\/mbmlog.com\/wp-content\/uploads\/2026\/08\/v2-article-1786504926781-3.jpg\" alt=\"Cost breakdown for ocean freight shipping of electric forklifts from China (ID#3)\" title=\"Sea Freight Shipping Costs\"><\/p>\n<p>The base ocean rate is only one line on the final bill. In our experience quoting shipments to the United States and Europe, importers who budget only for the ocean leg are usually surprised by 30\u201350% in additional charges. Here is how the full picture breaks down.<\/p>\n<h3>Full cost breakdown<\/h3>\n<table>\n<thead>\n<tr>\n<th>Cost Item<\/th>\n<th>Typical Driver<\/th>\n<th>Who Often Forgets It<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Ocean freight (40HQ)<\/td>\n<td>Route, season, carrier ($1,500\u2013$4,000 range)<\/td>\n<td>Rarely forgotten<\/td>\n<\/tr>\n<tr>\n<td>DG surcharge<\/td>\n<td>Class 9 lithium battery classification<\/td>\n<td>First-time importers<\/td>\n<\/tr>\n<tr>\n<td>DG documentation fees<\/td>\n<td>DGD preparation by certified specialist<\/td>\n<td>Buyers using new forwarders<\/td>\n<\/tr>\n<tr>\n<td>Inland trucking in China<\/td>\n<td>Factory location to port distance<\/td>\n<td>Buyers on EXW terms<\/td>\n<\/tr>\n<tr>\n<td>Container loading and securing<\/td>\n<td>Disassembly, lashing, dunnage<\/td>\n<td>Almost everyone<\/td>\n<\/tr>\n<tr>\n<td>Customs clearance procedures<\/td>\n<td>Both export and import sides<\/td>\n<td>Buyers comparing FOB quotes<\/td>\n<\/tr>\n<tr>\n<td>Import duties and taxes<\/td>\n<td>HS Code 842710 rates at destination<\/td>\n<td>DDP-inexperienced buyers<\/td>\n<\/tr>\n<tr>\n<td>Destination handling and delivery<\/td>\n<td>Port fees, drayage, final trucking<\/td>\n<td>Buyers with low CIF quotes<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Incoterms shape who pays what<\/h3>\n<p>Your shipping terms decide which of these costs land on your invoice. Under EXW, you carry nearly everything from the factory gate. FOB is the standard choice for experienced importers who use their own freight forwarder China-side; the supplier covers costs to the port, and you control the ocean booking. CIF and DDP look simpler, but they can hide who controls the DG booking and inland handling. For electric forklifts specifically, we usually recommend buyers keep more control, because the battery paperwork and loading process need active coordination. A DDP quote from a supplier who has never handled Class 9 cargo is a risk, not a convenience.<\/p>\n<h3>Insurance deserves a hard look<\/h3>\n<p>Standard <a href=\"https:\/\/iumi.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">marine insurance coverage<\/a> <sup id=\"ref-3\"><a href=\"#footnote-3\" class=\"footnote-ref\">3<\/a><\/sup> often excludes lithium-ion fires under &quot;inherent vice&quot; clauses. We advise clients to request a specific thermal runaway rider so a battery incident is actually covered. The premium difference is small compared to the value of a container of forklifts.<\/p>\n<div class=\"claim-pair\">\n<div class=\"claim claim-true\">\n<div class=\"claim-title\"><span class=\"claim-icon\">\u2714<\/span> Standard marine insurance policies often exclude lithium battery fires under inherent vice clauses <span class=\"claim-label\">True<\/span><\/div>\n<div class=\"claim-explanation\">Many marine policies treat thermal runaway as a defect inherent to the cargo itself, so importers need a specific thermal runaway rider to be covered for battery-related fire losses.<\/div>\n<\/div>\n<div class=\"claim claim-false\">\n<div class=\"claim-title\"><span class=\"claim-icon\">\u2718<\/span> The ocean freight rate is the main cost of shipping an electric forklift from China <span class=\"claim-label\">False<\/span><\/div>\n<div class=\"claim-explanation\">DG surcharges, inland trucking, loading, customs clearance, duties, and destination charges frequently add 30\u201350% or more on top of the base ocean rate, so the landed cost matters far more than the rate alone.<\/div>\n<\/div>\n<\/div>\n<h2>How do lithium batteries affect my electric forklift sea shipment from China?<\/h2>\n<p>A distributor in Texas once asked me why his diesel forklifts shipped in a week but his electric order needed three weeks of lead time. The answer sat inside the battery compartment.<\/p>\n<p><strong>Lithium batteries classify your forklift as Class 9 dangerous goods under the IMDG Code (UN3480\/UN3481), requiring carrier DG acceptance before booking, a battery state of charge at or below 30% at loading, BMS shipping mode activation, and full DG documentation including UN38.3 and MSDS.<\/strong><\/p>\n<p><img decoding=\"async\" style=\"max-width:100%; height:auto;\" src=\"https:\/\/mbmlog.com\/wp-content\/uploads\/2026\/08\/v2-article-1786504929657-4.jpg\" alt=\"Lithium battery regulations and dangerous goods requirements for forklift sea shipments (ID#4)\" title=\"Lithium Battery Shipping Rules\"><\/p>\n<p>The battery changes almost every step of the process. Shipping an electric forklift is not the same as shipping a normal machine, and treating it like ordinary cargo is the single most common mistake we see.<\/p>\n<h3>DG acceptance comes before everything<\/h3>\n<p>Carriers must approve Class 9 hazardous goods before space is confirmed. Not every vessel accepts lithium battery cargo, and DG slots are limited. That is why we collect battery chemistry, capacity, state of charge, and charger details before quoting. Booking first and sorting the battery later leads to rollovers and rebooking fees.<\/p>\n<h3>Physical battery preparation<\/h3>\n<p>Three practical steps protect the battery during a long ocean transit:<\/p>\n<ol>\n<li><strong>Reduce the state of charge to 30% or below.<\/strong> This is a commonly cited lithium battery shipping requirement for loading, though individual carriers may set their own thresholds \u2014 always confirm with the carrier before loading.<\/li>\n<li><strong>Activate the BMS &quot;Deep Sleep&quot; or &quot;Shipping Mode.&quot;<\/strong> Parasitic drain over an 18\u201340 day voyage can permanently deplete cells. We ask factories to confirm this step in writing before the container is sealed.<\/li>\n<li><strong>Consider fire isolation measures.<\/strong> Intumescent fire blankets or specialized container liners add a proactive layer that keeps a single-unit thermal event from spreading. For high-value multi-unit containers, we treat this as cheap protection.<\/li>\n<\/ol>\n<h3>Pre-shipment verification<\/h3>\n<p>Third-party <a href=\"https:\/\/www.sgs.com\/en\/trade\/inspection-services\" target=\"_blank\" rel=\"noopener noreferrer\">pre-shipment inspections<\/a> <sup id=\"ref-4\"><a href=\"#footnote-4\" class=\"footnote-ref\">4<\/a><\/sup> by firms like SGS or Bureau Veritas can verify hydraulic integrity and battery state-of-health before the container is sealed. For first orders from a new factory, we recommend this strongly. A battery problem discovered at your warehouse in the US is expensive; the same problem caught at the factory in China is a supplier issue, not yours.<\/p>\n<div class=\"claim-pair\">\n<div class=\"claim claim-true\">\n<div class=\"claim-title\"><span class=\"claim-icon\">\u2714<\/span> Carriers must accept the Class 9 dangerous goods booking before space can be confirmed <span class=\"claim-label\">True<\/span><\/div>\n<div class=\"claim-explanation\">Lithium battery cargo requires explicit DG acceptance from the carrier, and DG slots are limited, so the battery details must be reviewed and approved before any sailing is guaranteed.<\/div>\n<\/div>\n<div class=\"claim claim-false\">\n<div class=\"claim-title\"><span class=\"claim-icon\">\u2718<\/span> A fully charged battery ships fine as long as the paperwork is complete <span class=\"claim-label\">False<\/span><\/div>\n<div class=\"claim-explanation\">Loading guidance commonly requires the state of charge at or below 30%, and a fully charged pack without BMS shipping mode raises both safety risk and the chance of carrier rejection at the port.<\/div>\n<\/div>\n<\/div>\n<h2>How long does sea freight take to ship an electric forklift from China to my country?<\/h2>\n<p>The lesson I learned early in this business: importers plan around sailing time, but shipments run on total time. Those are very different numbers, and the gap causes missed delivery promises.<\/p>\n<p><strong>Port-to-port sea freight for an electric forklift from China takes roughly 18\u201340 days depending on the route. Total door-to-door time, including factory pickup, DG document preparation, container loading, customs clearance, and final delivery, typically runs 4\u201310 weeks.<\/strong><\/p>\n<p><img decoding=\"async\" style=\"max-width:100%; height:auto;\" src=\"https:\/\/mbmlog.com\/wp-content\/uploads\/2026\/08\/v2-article-1786504932372-5.jpg\" alt=\"Sea freight transit time estimates for electric forklifts shipped from China (ID#5)\" title=\"Shipping Transit Timeframes\"><\/p>\n<p>Sailing time is only the middle chapter of the story. Here is how a realistic timeline breaks down for a China-to-US or China-to-Europe shipment.<\/p>\n<h3>Realistic timeline stages<\/h3>\n<table>\n<thead>\n<tr>\n<th>Stage<\/th>\n<th>Typical Duration<\/th>\n<th>What Can Delay It<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Battery document collection<\/td>\n<td>3\u201310 days<\/td>\n<td>Missing or mismatched UN38.3 report<\/td>\n<\/tr>\n<tr>\n<td>DG booking and carrier acceptance<\/td>\n<td>3\u20137 days<\/td>\n<td>Limited Class 9 slots on the route<\/td>\n<\/tr>\n<tr>\n<td>Factory pickup and container loading<\/td>\n<td>2\u20135 days<\/td>\n<td>Disassembly needs, ramp or crane access<\/td>\n<\/tr>\n<tr>\n<td>Export customs clearance<\/td>\n<td>1\u20133 days<\/td>\n<td>Invoice and declaration mismatches<\/td>\n<\/tr>\n<tr>\n<td>Ocean transit (port to port)<\/td>\n<td>18\u201340 days<\/td>\n<td>Route, transshipment, port congestion<\/td>\n<\/tr>\n<tr>\n<td>Import clearance and delivery<\/td>\n<td>3\u201314 days<\/td>\n<td>HS code disputes, incomplete DG paperwork<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>Loading preparation eats more time than people expect<\/h3>\n<p>Electric forklifts often need partial disassembly before they fit a standard container. Masts may be removed or tilted, overhead guards folded, and forks detached and laid alongside the machine to save space and reduce risk. The unit is then secured with chains, straps, blocking, and dunnage. We confirm early whether the forklift can drive into the container, needs a ramp, or must be craned in. Oversized units that will not fit a standard box may need a flat rack container, and on some routes Ro-Ro shipping is an option when the port network supports it \u2014 though <a href=\"https:\/\/mbmlog.com\/how-ship-electric-forklifts-china-2026-guide-to\/\">FCL remains the default<\/a> for control and safety, and it minimizes the battery impact damage risk associated with LCL handling.<\/p>\n<h3>Start the paperwork before the cargo is ready<\/h3>\n<p>The single best way to compress the timeline is parallel work. We collect the UN38.3 report, MSDS, and charger specs while the factory is still building the forklift. When production finishes, DG acceptance is already secured and the container books immediately. Importers who wait until cargo is ready routinely lose one to two weeks to document chasing and rebooking.<\/p>\n<h2>Conclusion<\/h2>\n<p>Shipping electric forklifts from China via sea freight succeeds on three things: battery compliance, correct documents, and secure container loading. Prepare the DG paperwork early, and the rest follows predictably.<\/p>\n<h2>Footnotes<\/h2>\n<p><span id=\"footnote-1\"><br \/>\n1. Official IMO page detailing the International Maritime Dangerous Goods Code for safe sea transport. <a href=\"#ref-1\" class=\"footnote-backref\">\u21a9\ufe0e<\/a><br \/>\n<\/span><\/p>\n<p><span id=\"footnote-2\"><br \/>\n2. Authoritative OSHA resource explaining requirements for hazard communication and safety data sheets in the workplace. <a href=\"#ref-2\" class=\"footnote-backref\">\u21a9\ufe0e<\/a><br \/>\n<\/span><\/p>\n<p><span id=\"footnote-3\"><br \/>\n3. Homepage of the International Union of Marine Insurance, providing global standards and data for marine underwriters. <a href=\"#ref-3\" class=\"footnote-backref\">\u21a9\ufe0e<\/a><br \/>\n<\/span><\/p>\n<p><span id=\"footnote-4\"><br \/>\n4. Official site of SGS, a leading global provider of inspection, verification, and testing services. <a href=\"#ref-4\" class=\"footnote-backref\">\u21a9\ufe0e<\/a><br \/>\n<\/span><\/p>\n<p><script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"FAQPage\",\n  \"mainEntity\": [\n    {\n      \"@type\": \"Question\",\n      \"name\": \"How to Ship Electric Forklifts from China via Sea Freight?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"To ship electric forklifts from China via sea freight, book FCL container space with a carrier that accepts Class 9 dangerous goods, prepare UN38.3, MSDS, and a Dangerous Goods Declaration, secure the forklift inside a 20ft or 40HQ container, and clear customs under HS Code 8427.10.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"What documents do I need to ship an electric forklift from China by sea?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"You need a commercial invoice, packing list, Bill of Lading, Certificate of Origin, export customs declaration, plus three battery documents: a UN38.3 test report, a Material Safety Data Sheet (MSDS), and a signed Dangerous Goods Declaration prepared by a qualified DG specialist.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"How much does it cost to ship an electric forklift from China via sea freight?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Ocean freight for a 40HQ container carrying electric forklifts typically runs $1,500\u2013$4,000 depending on route and service level. Add DG surcharges, inland trucking, container loading, customs clearance, and destination charges, so budget the full landed cost rather than the base ocean rate alone.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"How do lithium batteries affect my electric forklift sea shipment from China?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Lithium batteries classify your forklift as Class 9 dangerous goods under the IMDG Code (UN3480\/UN3481), requiring carrier DG acceptance before booking, a battery state of charge at or below 30% at loading, BMS shipping mode activation, and full DG documentation including UN38.3 and MSDS.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"How long does sea freight take to ship an electric forklift from China to my country?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Port-to-port sea freight for an electric forklift from China takes roughly 18\u201340 days depending on the route. Total door-to-door time, including factory pickup, DG document preparation, container loading, customs clearance, and final delivery, typically runs 4\u201310 weeks.\"\n      }\n    }\n  ]\n}\n<\/script><\/p>\n<p><script type=\"application\/ld+json\">\n[\n  {\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"ClaimReview\",\n    \"url\": \"\",\n    \"claimReviewed\": \"The UN38.3 test report must be issued by the battery manufacturer, not the forklift assembler\",\n    \"author\": {\n      \"@type\": \"Organization\",\n      \"name\": \"Article Author\"\n    },\n    \"reviewRating\": {\n      \"@type\": \"Rating\",\n      \"ratingValue\": 5,\n      \"bestRating\": 5,\n      \"worstRating\": 1,\n      \"alternateName\": \"True\"\n    }\n  },\n  {\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"ClaimReview\",\n    \"url\": \"\",\n    \"claimReviewed\": \"A standard machinery invoice and packing list are enough to ship an electric forklift by sea\",\n    \"author\": {\n      \"@type\": \"Organization\",\n      \"name\": \"Article Author\"\n    },\n    \"reviewRating\": {\n      \"@type\": \"Rating\",\n      \"ratingValue\": 1,\n      \"bestRating\": 5,\n      \"worstRating\": 1,\n      \"alternateName\": \"False\"\n    }\n  },\n  {\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"ClaimReview\",\n    \"url\": \"\",\n    \"claimReviewed\": \"Standard marine insurance policies often exclude lithium battery fires under inherent vice clauses\",\n    \"author\": {\n      \"@type\": \"Organization\",\n      \"name\": \"Article Author\"\n    },\n    \"reviewRating\": {\n      \"@type\": \"Rating\",\n      \"ratingValue\": 5,\n      \"bestRating\": 5,\n      \"worstRating\": 1,\n      \"alternateName\": \"True\"\n    }\n  },\n  {\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"ClaimReview\",\n    \"url\": \"\",\n    \"claimReviewed\": \"The ocean freight rate is the main cost of shipping an electric forklift from China\",\n    \"author\": {\n      \"@type\": \"Organization\",\n      \"name\": \"Article Author\"\n    },\n    \"reviewRating\": {\n      \"@type\": \"Rating\",\n      \"ratingValue\": 1,\n      \"bestRating\": 5,\n      \"worstRating\": 1,\n      \"alternateName\": \"False\"\n    }\n  },\n  {\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"ClaimReview\",\n    \"url\": \"\",\n    \"claimReviewed\": \"Carriers must accept the Class 9 dangerous goods booking before space can be confirmed\",\n    \"author\": {\n      \"@type\": \"Organization\",\n      \"name\": \"Article Author\"\n    },\n    \"reviewRating\": {\n      \"@type\": \"Rating\",\n      \"ratingValue\": 5,\n      \"bestRating\": 5,\n      \"worstRating\": 1,\n      \"alternateName\": \"True\"\n    }\n  },\n  {\n    \"@context\": \"https:\/\/schema.org\",\n    \"@type\": \"ClaimReview\",\n    \"url\": \"\",\n    \"claimReviewed\": \"A fully charged battery ships fine as long as the paperwork is complete\",\n    \"author\": {\n      \"@type\": \"Organization\",\n      \"name\": \"Article Author\"\n    },\n    \"reviewRating\": {\n      \"@type\": \"Rating\",\n      \"ratingValue\": 1,\n      \"bestRating\": 5,\n      \"worstRating\": 1,\n      \"alternateName\": \"False\"\n    }\n  }\n]\n<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Learn how to ship electric forklifts from China via sea freight, from battery paperwork and HS codes to container booking that avoids costly port delays.<\/p>","protected":false},"author":2,"featured_media":11554,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[48],"tags":[],"class_list":["post-11559","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-import-electrical-forklift-from-china"],"_links":{"self":[{"href":"https:\/\/mbmlog.com\/it\/wp-json\/wp\/v2\/posts\/11559","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mbmlog.com\/it\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mbmlog.com\/it\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mbmlog.com\/it\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/mbmlog.com\/it\/wp-json\/wp\/v2\/comments?post=11559"}],"version-history":[{"count":1,"href":"https:\/\/mbmlog.com\/it\/wp-json\/wp\/v2\/posts\/11559\/revisions"}],"predecessor-version":[{"id":12697,"href":"https:\/\/mbmlog.com\/it\/wp-json\/wp\/v2\/posts\/11559\/revisions\/12697"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/mbmlog.com\/it\/wp-json\/wp\/v2\/media\/11554"}],"wp:attachment":[{"href":"https:\/\/mbmlog.com\/it\/wp-json\/wp\/v2\/media?parent=11559"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mbmlog.com\/it\/wp-json\/wp\/v2\/categories?post=11559"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mbmlog.com\/it\/wp-json\/wp\/v2\/tags?post=11559"}],"curies":[{"name":"parola chiave","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}